Elsing Village Hall
The problem: Elsing Village Hall had a big noise problem— no matter the event, hearing anything clearly was a challenge. Whether the space was packed or half empty, sound bounced around the room, making conversations and presentations difficult to follow. After trying a simple hanging solution on the ceiling with no success, it became clear that a professional approach was necessary to resolve the issue.
Room Type: Village Halls
Location: Elsing, Dereham
Our solution
Resonics stepped in to transform the space acoustically.
We installed a combination of SilentRaft and SilentWall acoustic panels, arranged across the ceiling and walls to get the best possible coverage. These treatments were chosen for their ability to provide:
- Class A Sound Absorption: The panels provide exceptional sound absorption, effectively controlling echo and reverberation throughout the hall.
- Comprehensive Coverage: The high-density ceiling configuration ensures consistent acoustic treatment across the entire room, improving clarity and reducing noise levels.
- Durability: Designed for long-term use, the panels deliver reliable performance for a venue that regularly hosts various community activities and events.
Every panel was installed with care and precision, blending seamlessly into the hall’s interior while dramatically improving its sound quality.
The Outcome
The difference was immediate. Conversations are now easy to follow, announcements are crisp and music sounds balanced instead of echoey.
The hall has become a much more enjoyable place for the community to come together — whether for meetings, performances, or celebrations.
Need expert acoustic advice?
Call us on 020 7858 1030 or request a quote below—we’ll contact you.
Request a Quote
The consensus is positive and there have been several ‘Wows’, not least over the dramatic appearance of the full array of new ceiling panels. This all goes to reflect the efficient work done by Resonics, particularly its planning and construction people, in advising, costing and then delivering the goods. Overall, the exercise has gone well, full external funding has been achieved and a cost effective and purpose-made end result has been seamlessly achieved.
Elsing Village Hall Committee
Related case studies